top of page

Intended Audience:

Curriculum

  • Installation and Maintenance Personnel

  • Subcontractors
     

  • Connecticut Construction General Permit  

  • Connecticut Erosion Control

  • Connecticut Sediment Control

  • Connecticut On-Site Inspections

  • Connecticut SPCP

Learning Objectives:

  • Identify the components and framework of the National Pollutant Discharge Elimination System (NPDES) permit program.   

  • Describe the proper installation and maintenance of stormwater Best Management Practices (BMPs).

  • Articulate the steps necessary to inspect a construction sites and determine possible causes of BMP ineffectiveness and how to correct them.

  • Demonstrate how to complete an inspection report and document corrective actions.

  • Assess the proper installation and maintenance of stormwater Best Management Practices/Stormwater Control Measures.

  • Summarize the communication process necessary between owner, operators, contractors, and stormwater pollution prevention plan designer so the site stays in compliance throughout the construction project.

2024-08-21_15-53-34.png

At the Completion of This Program You Will Receive:

  • 18.5 PDHs

  • 2 - Embossed Wall Certificates (1-QCIS Certificate, 1-QPSPCP Certificate)

  • 2 - Wallet Cards (1-QCIS Card, 1-QPSPCP Card)

  • 2 - Hardhat Decals (1-QCIS Decal, 1-QPSPCP Decal)

  • Signed Congratulations Letter

  • QCIS and QPSPCP Logos for your Business Card and Website (Available on the Credential Validation Page)

  • Resume' Enhancer (Available on the Credential Validation Page)

bottom of page