top of page
2024-08-21_16-57-01.png

Intended Audience:

Curriculum

  • Installation and Maintenance Personnel

  • Subcontractors
     

  • Connecticut Construction General Permit  

  • Connecticut Erosion Control

  • Connecticut Sediment Control

  • Connecticut On-Site Inspections

  • Connecticut SPCP

Learning Objectives:

  • Identify the components and framework of the National Pollutant Discharge Elimination System (NPDES) permit program.   

  • Describe the proper installation and maintenance of stormwater Best Management Practices (BMPs).

  • Articulate the steps necessary to inspect a construction sites and determine possible causes of BMP ineffectiveness and how to correct them.

  • Demonstrate how to complete an inspection report and document corrective actions.

  • Assess the proper installation and maintenance of stormwater Best Management Practices/Stormwater Control Measures.

  • Summarize the communication process necessary between owner, operators, contractors, and stormwater pollution prevention plan designer so the site stays in compliance throughout the construction project.

At the Completion of This Program You Will Receive:

  • 18.5 PDHs

  • 2 - Embossed Wall Certificates (1-QCIS Certificate, 1-QPSPCP Certificate)

  • 2 - Wallet Cards (1-QCIS Card, 1-QPSPCP Card)

  • 2 - Hardhat Decals (1-QCIS Decal, 1-QPSPCP Decal)

  • Signed Congratulations Letter

  • QCIS and QPSPCP Logos for your Business Card and Website (Available on the Credential Validation Page)

  • Resume' Enhancer (Available on the Credential Validation Page)

bottom of page